Day 5, build an organ in a week

All the major parts are completed.

No photographs as I forgot to take the camera out to the workshop.

Harold made the spools and the drive wheel for the take up.

The plastic tubing was acquired.

To save time the top of the pressure box will be a single sheet of plastic.

Optimistically I wanted the bellows and pressure box connected by the end of the day. This did not happen. A few bearing blocks need to be made along with the pump sticks. Having everything else ready to assemble should make for an interesting day tomorrow. It will probably be another long day.